New Amenity Block for 2023 – Byworth Meadow

Over the winter we’ve been hard at work upgrading the facilities on Byworth Meadow. The amenity block at the bottom of the field has been knocked down, having been in place for about 30 years.

A new one is being built in its place to match the more modern style blocks across the rest of the site. It will contain all new male and female showering and toilet facilities as well as a family shower room and washing up sinks.

The aim is to have the new block open by the Whitsun Bank Holiday at the end of May.

Pitches 43 to 60 are unavailable when we open on 31st March until the block is finished. Pitches 1 to 42 will be served by the top block on Byworth Meadow in the meantime.